EyeLink Log

Notable events for the SR eye trackers.

date scanner event
2026-07-30 TerraX onsite install from SRR
2025-09-16 TerraX customs shipping date
2025-08-27 P2/32ch surface-first mirror tape failed. fell out
2025-??-?? ?? surface-first mirror adhesive fully extended across back
2024-09-05 P1 + P2 installed surface-first mirrors
2024-08-13 P2 fiber optic camera head replaced (RMA)